{"id":9442,"date":"2025-09-03T20:52:29","date_gmt":"2025-09-03T12:52:29","guid":{"rendered":"https:\/\/www.esetsolar.com\/new20250903\/"},"modified":"2025-12-19T10:29:47","modified_gmt":"2025-12-19T02:29:47","slug":"new20250903","status":"publish","type":"post","link":"https:\/\/www.esetsolar.com\/en\/new20250903\/","title":{"rendered":"ESET SOLAR’s Saudi Manufacturing Base Reaches Key Milestone, Phase I Nears Completion"},"content":{"rendered":"

ESET SOLAR, a global leader in green smart manufacturing and all-scenario\u00a0 PV mounting solutions, is making significant strides in the construction of its first Middle Eastern manufacturing base in Jeddah, Saudi Arabia. The Phase\u00a0 I\u00a0 project, which commenced\u00a0 with\u00a0 the\u00a0 groundbreaking\u00a0 ceremony\u00a0 in\u00a0 August\u00a0 2025\u00a0 at\u00a0 the\u00a0 MODON Second Industrial Park, is now entering its final stage.<\/p>\n

Spanning 15,204 square meters, the Phase I facility is a cornerstone of the larger 7GW\u00a0 annual\u00a0 capacity\u00a0 plan.\u00a0 Construction\u00a0 has\u00a0 progressed\u00a0 rapidly,\u00a0 with\u00a0 foundation works for the torque tube production line fully completed. The galvanizing production line is also advancing swiftly and is expected to be ready for trial production by the end\u00a0 of\u00a0 this\u00a0 month.\u00a0 To\u00a0 ensure\u00a0 both\u00a0 efficiency\u00a0 and\u00a0 safety,\u00a0 the\u00a0 project\u00a0 team\u00a0 has implemented strategic measures, including leasing backup warehouses for flexible material logistics and employing steel sheet pile\u00a0 reinforcement techniques for the deep foundations of the galvanizing line.<\/p>\n

Concurrently,\u00a0 plans for\u00a0 Phase\u00a0 II\u00a0 are\u00a0 actively\u00a0 underway.\u00a0 Having\u00a0 secured\u00a0 MODON approval\u00a0 and\u00a0 land\u00a0 use\u00a0 rights\u00a0 for\u00a0 a\u00a0\u00a0 100,000-square-meter\u00a0 plot,\u00a0 the\u00a0 company\u00a0 is progressing with architectural design. Targeted for operational status by the end of 2026, the full-scale manufacturing park will integrate R&D, production, processing, warehousing, and logistics, creating a comprehensive renewable energy industrial ecosystem.<\/p>\n

With\u00a0 a\u00a0 total\u00a0 investment \u00a0of\u00a0 approximately\u00a0 218\u00a0 million\u00a0 Saudi\u00a0 Riyals,\u00a0 the\u00a0 project’s strategic importance extends far beyond its physical footprint. Upon full completion, it is set to generate substantial local employment, transfer advanced manufacturing technology and management expertise, and stimulate the growth of upstream and downstream industries. This initiative stands as a powerful testament to Sino-Saudi cooperation,\u00a0\u00a0 directly\u00a0\u00a0 supporting\u00a0\u00a0 the\u00a0\u00a0\u00a0 industrial\u00a0\u00a0 diversification\u00a0\u00a0\u00a0 and\u00a0\u00a0 sustainable development\u00a0 goals\u00a0 outlined\u00a0\u00a0 in\u00a0 “Saudi\u00a0 Vision\u00a0 2030.”\u00a0\u00a0 Under\u00a0 the\u00a0 global\u00a0 strategic guidance of its\u00a0 parent company, the\u00a0 METAVAST GROUP,\u00a0 ESET\u00a0 SOLAR\u00a0 is firmly positioned to write a new chapter in international production capacity cooperation and the global energy transition.<\/p>\n","protected":false},"excerpt":{"rendered":"

ESET SOLAR, a global leader in green smart manufacturing and all-scenario\u00a0 PV mounting solutions, is making significant strides in the construction of its first Middle Eastern manufacturing base in Jeddah, Saudi Arabia. The Phase\u00a0 I\u00a0 project, which commenced\u00a0 with\u00a0 the\u00a0 groundbreaking\u00a0 ceremony\u00a0 in\u00a0 August\u00a0 2025\u00a0 at\u00a0 the\u00a0 MODON Second Industrial Park, is now entering its […]<\/p>\n","protected":false},"author":1,"featured_media":9444,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9442","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/posts\/9442","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/comments?post=9442"}],"version-history":[{"count":2,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/posts\/9442\/revisions"}],"predecessor-version":[{"id":45138,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/posts\/9442\/revisions\/45138"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/media\/9444"}],"wp:attachment":[{"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/media?parent=9442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/categories?post=9442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/tags?post=9442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}