{"id":44544,"date":"2025-11-27T21:07:09","date_gmt":"2025-11-27T13:07:09","guid":{"rendered":"https:\/\/www.esetsolar.com\/new20251127\/"},"modified":"2025-12-09T15:02:05","modified_gmt":"2025-12-09T07:02:05","slug":"new20251127","status":"publish","type":"post","link":"https:\/\/www.esetsolar.com\/en\/new20251127\/","title":{"rendered":"Key Zinc Pot Installation Accelerates ESET SOLAR’s Saudi Manufacturing Base Towards Operation"},"content":{"rendered":"
ESET\u00a0 SOLAR\u00a0 announced\u00a0 a\u00a0 critical\u00a0\u00a0 milestone\u00a0 for\u00a0 its\u00a0 Jeddah\u00a0\u00a0 Industrial\u00a0\u00a0 Park manufacturing base on November 27, 2025: the successful positioning of the zinc pot, a core component for the hot-dip galvanizing process. This achievement signals the imminent\u00a0 completion\u00a0 of\u00a0 the\u00a0 Phase\u00a0 I\u00a0 project\u00a0 and\u00a0 lays\u00a0 a\u00a0 solid\u00a0 foundation\u00a0 for the installation and commissioning of subsequent production lines.<\/p>\n
<\/p>\n
As a pivotal part of ESET SOLAR’s global strategy, the Saudi base is a key vehicle for the dual-wheel drive of “capacity + technology” expansion overseas. The company is leveraging its extensive experience and advanced technology in hot-dip galvanizing to develop products with superior weather resistance, specifically engineered to perform reliably in the extreme conditions of high temperatures and strong winds prevalent in the Middle East.<\/p>\n
<\/p>\n
The\u00a0 newly\u00a0 positioned\u00a0 zinc\u00a0 pot\u00a0 has\u00a0 been\u00a0 specially\u00a0 optimized\u00a0 for\u00a0 these\u00a0 harsh environments. Its internal heating design, coupled with a waste heat recovery module, significantly improves energy efficiency. A state-of-the-art digital temperature control system\u00a0 ensures\u00a0 precise\u00a0\u00a0 management\u00a0 of\u00a0 the\u00a0 zinc\u00a0\u00a0 bath,\u00a0 which\u00a0\u00a0 is\u00a0\u00a0 crucial\u00a0 for guaranteeing\u00a0 the\u00a0 final\u00a0 product \u00a0quality\u00a0 and\u00a0 corrosion\u00a0 resistance\u00a0 of\u00a0 PV\u00a0 mounting structures.<\/p>\n
<\/p>\n
The\u00a0 commissioning\u00a0 of\u00a0 this\u00a0 base\u00a0 is\u00a0 highly\u00a0 anticipated\u00a0 within\u00a0 the\u00a0 industry.\u00a0 Once operational, the localized production model, backed by ESET SOLAR’s proprietary core technologies and mature R&D, quality, and manufacturing management systems, will substantially shorten delivery lead times and\u00a0 reduce operational and\u00a0 logistics costs. This will inject new vitality into the regional new energy industry and provide significant momentum for ESET SOLAR’s continued leadership in the global green energy sector.<\/p>\n","protected":false},"excerpt":{"rendered":"
ESET\u00a0 SOLAR\u00a0 announced\u00a0 a\u00a0 critical\u00a0\u00a0 milestone\u00a0 for\u00a0 its\u00a0 Jeddah\u00a0\u00a0 Industrial\u00a0\u00a0 Park manufacturing base on November 27, 2025: the successful positioning of the zinc pot, a core component for the hot-dip galvanizing process. This achievement signals the imminent\u00a0 completion\u00a0 of\u00a0 the\u00a0 Phase\u00a0 I\u00a0 project\u00a0 and\u00a0 lays\u00a0 a\u00a0 solid\u00a0 foundation\u00a0 for the installation and commissioning of subsequent […]<\/p>\n","protected":false},"author":1,"featured_media":44545,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-44544","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/posts\/44544","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/comments?post=44544"}],"version-history":[{"count":2,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/posts\/44544\/revisions"}],"predecessor-version":[{"id":44550,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/posts\/44544\/revisions\/44550"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/media\/44545"}],"wp:attachment":[{"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/media?parent=44544"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/categories?post=44544"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esetsolar.com\/en\/wp-json\/wp\/v2\/tags?post=44544"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}